Fly ash sampler sampling

time:2023-11-25 22:42:41Views:

1. Determination of Sampling


The sampling of fly ash sampler is selected on the flue between the outlet of the air preheater and the inlet of the dust collector. The specific installation location should generally meet the following conditions:


The flue gas temperature is less than 370 ℃;


At the straight pipe outer wall of the horizontal flue, and at a height of 1/3 of the flue from the bottom of the flue; Or at the straight pipe side wall of the vertical flue, and at a distance of 1/3 of the flue thickness from the rear wall of the flue;


There are no obstacles in the flue that affect positive sampling;


The representative parts of smoke flow velocity and dust particles;


There is a space outside the flue for the installation of measuring devices and normal operation.


2. Opening of sampling holes


According to the determined sampling location, remove the insulation layer of the flue after shutdown, and cut a 142mm (width) X232mm (height) rectangular hole on the flue wall for welding the rectangular flange.


3. Welding of canopies, flanges, and brackets


Remove the insulation layer of the flue between the canopy and the installation bracket of the measurement unit according to Figure 5, and then weld the canopy, rectangular flange, measurement unit installation bracket, extended angle iron, support angle iron, and pressure regulating valve installation plate separately (the welding position of the extended angle iron and pressure regulating valve installation plate depends on the on-site situation). When welding, it is necessary to ensure that the distance from the bottom edge of the rain shelter to the rectangular flange is 130mm; 2. The installation surface of the rectangular flange is perpendicular to the ground; 3. The distance from the installation surface of the rectangular flange to the flue wall is 350mm; The distance between the installation bracket of the measuring unit and the rectangular flange is ensured by the welding auxiliary connecting plate.


 

手機(jī)導(dǎo)入圖片 1202.jpg

手機(jī)導(dǎo)入圖片 1205.jpg

手機(jī)導(dǎo)入圖片 1204.jpg

If the sampling unit is not installed temporarily, the square holes on the rectangular flange should be covered with the flange cover provided by the manufacturer and tightened with screws to ensure the sealing of the flue during boiler operation.


4. Welding of on-site control cabinet installation bracket


The installation bracket of the control unit can be welded between two measuring units or on a steel column near a certain measuring unit according to the on-site conditions. During welding, the height from the edge of the installation bracket to the on-site walkway or platform surface should be about 1.8 meters.


5. Installation of sampling unit


6. Adjust the sampling tube


According to the different positions of the flue installed in the sampling unit, it is necessary to adjust the sampling tube to ensure that the direction of the intake nozzle of the sampling tube is aligned with the direction of the flue gas flow. Adjustment method: 1. Loosen the nut (1), 2. Loosen the long nut, 3. Pull out the sampling tube in an upward direction until the cylindrical pin on the circular flange of the sampling tube is detached from the installation plate. 4. Rotate the sampling tube according to the flow direction of the throat at the installation position, so that the intake nozzle of the sampling tube is facing the direction of the smoke flow. Then insert the cylindrical pin on the circular flange of the sampling tube into the corresponding positioning space on the installation plate. 5. Tighten the long nut, 6. Finally, tighten the nut (1).


7. Installation of measurement units


Installation method: 1. Place the measuring unit on the installation rack and place a spirit level (provided with the equipment) on the measuring unit section; 2. By adjusting the lifting of the four bolts and rods at the bottom of the measuring unit, combined with the stable horizontal movement of the measuring unit, the ash inlet of the measuring unit is concentric with the lower ash outlet of the sampling unit cyclone dust collector. At the same time, the transition pipe component can precisely connect the lower ash outlet of the sampling unit cyclone dust collector and the ash inlet of the measuring unit; 3. Fine tune the 4 rod bolts at the bottom of the measuring unit, while observing the level of the measuring unit, so that the surface of the measuring unit is in a horizontal state; 4. Tighten the nut of the transition pipe component between the measuring unit and the sampling unit cyclone dust collector; 5. Tighten the four parallel nuts of the rod bolts at the bottom of the measuring unit; 6. Tighten the four tie rod bolts at both ends of the bottom of the measuring unit and tighten the nuts; 7. After the installation of the measurement unit is completed, restore the insulation layer and protective iron sheet on the flue wall.


產(chǎn)品動(dòng)態(tài)

Fly ash sampler sampling生產(chǎn)廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

国产强被迫伦姧在线观看无码| 无码区国产区在线播放| 欧美最猛黑人xxxx| 国产欧美日韩一区二区图片 | 日韩中文字幕在线一区二区三区| 国产区在线观看成人精品| 成人精品一区二区| japanese在线| 国产一线二线三线女| 精品国产一区二区三区2021| 亚洲一区波多野结衣在线app| 夜夜爽夜夜叫夜夜高潮| 日本乱偷人妻中文字幕在线| 精品久久国产综合婷婷五月| 免费A级毛片高清视频不卡| 全免费A级毛片免费看无码| 欧美交a欧美精品喷水| 亚洲av片不卡无码久久嫩模| 狼色精品人妻在线视频免费| 3D动漫精品啪啪一区二区下载| 1000部精品久久久久久久久| 初尝黑人嗷嗷叫中文字幕| 精品一区二区三区无码视频| 偷偷要色偷偷中文无码| 亚洲av无码专区亚洲av网站| 国产成人精品视频一区二区不卡 | 亚洲一区精品无码| 337P中国人体啪啪| 日本一道综合一本88在线| 国产精品XXXX国产喷水| 亚洲AV综合色区无码二区偷拍 | 99精品成人片免费毛片无码| 999zyz玖玖资源站永久| 少妇激情AV一区二区三区| 欧洲精品无码一区二区三区在线播放| 亚洲av成人一区二区三区观看在线 | 欧美精品一级| 欧美大香蕉视频| 天天精品视频| 日日躁夜夜躁| 色噜噜噜噜噜|